Yard drainage: more important than it looks
Absheron rain is rare but heavy — 10-15 min brings 20 mm. Without drainage a house gets foundation cracks in 3-5 years, puddles by the pool, spring damp. A simple-looking system that's critical.
1. Why drainage matters
Absheron soil is clay-based, poor absorption. Water accumulates and creates 3 problems: 1) eats foundation concrete; 2) damp enters house (mould); 3) pool tiles crack, slippery. Drainage prevents all this.
2. Drainage types
3 main: 1) Surface (linear channels + sewer) — for yard and terrace, 60-140 AZN/m; 2) Deep (around foundation) — takes water from under the house, 80-180 AZN/m; 3) Drainage well (reservoir for downpours) — 1,200-3,500 AZN.
3. Standard package — 220 m² villa
For 220 m² with pool: surface 30 m (2,000-4,500 AZN); deep 40 m (3,200-7,200); drainage well (1,500-2,500); install (1,200-2,800). Total 7,900-17,000 AZN. Cheaper at construction stage.
4. 4 pre-purchase checks
1) Look for spring/autumn rain marks — stains at wall base; 2) Yard drainage channels visible; 3) Inspection around foundation — cracks and damp; 4) Water diversion at pool — no puddles.
Drainage package — 220 m² villa
| Element | Qty | Cost |
|---|---|---|
| Surface | 30 m | 2,000-4,500 AZN |
| Deep (foundation) | 40 m | 3,200-7,200 AZN |
| Drainage well | 1 system | 1,500-2,500 AZN |
| Install | - | 1,200-2,800 AZN |
| Total | 7,900-17,000 AZN |
Drainage is an «invisible but critical» system. Directly affects house lifespan. Good drainage protects the foundation for 20+ years, no drainage — major repair in 7-10 years.
Drainage checklist
- View in spring under rain — you see water tracks.
- Yard drainage channels should exist.
- Deep drainage around foundation.
- Drainage well for storms.
- At project stage — cheaper.
See also: insulation, Mardakan climate, landscape.